Welcome to the Khounxay Group
The Khounxay Group is a diversified business enterprise based in Laos in South East Asia. We are involved in construction, mining, stone crushing, plant & equipment and hospitality.
The Group is one of the largest privately owned companies in Laos with a turnover of $20,000,000 and over 1000 employees.
Khounxay is the name behind many of Laos largest and prestigious construction projects. Since 1995, we have been providing our clients with reliable solutions to their most complex construction challenges. [Read more]
Current & Recent Projects
- Western Tailings Storage Facility, Stage 3, Sepon Mine... [More]
- Construction of 3 star Hotel, Vientiane Municipal City [More]
- Construction of access roads to Gold Plant facility in Ban Houay xai Gold-Silver Projects [More]
- Construction of GS 2 Thenkham Sediment control dam[More]
- Upgrade of access road to Phu Kham Mine Site for Phu Bia Limited [More]
- Widening Road 28A from Nabo - Nalou gate, 40 Km... [More]
- Construction of 4 prestressed concrete reinforced bridges.. [More]
Tell me About...
Our Clients
- Lane Xang Mineral Limited.
- Phu Bia Mining Limited.
- Ministry of Public Works and Transport.
- Ministry of National Defence.
- Salamander( Lao) Limited.
- Ministry of Communication.
- Department of Agriculture and Forestry.
- Lao National Committee for Drug Control and Supervision.
- Houaphanh Province Provincial Government.
- Community- Managed.
- International Fund for Agriculture.
- ZOA.
- Japanese Government Grant.
- Committee for Lao-American Development.
- Construct and Maintain:
- Gravel surfaces
- Sealed Roads
- Reinforced concrete roads
- Asphalt Roads
- Build and Maintain
- Pilings
- Sub-structure
- Super-structure
- Bailey Bridge
- Pre-stressed concrete
- Span 18 - 25 metres
- Under drainage systems
- Cut off trench
- Dam embankment
- Seepage drainage systems
- Slope protection
- Seepage sum
- 50,000,000 metres 3
- Pollution control
- Sedimentation trap
Description: Contract for Earthworks for Western Tailings Storage Facility, Stage 3, Sepon, Savannakhet
Period: 2008
Scope: The main works involves The main works involves clearing, grubbing and stripping topsoil, construction underdrainage system, construction of earth embankment, sand seepage drainage blanket, construction of wearing course on the dam crest, sediment control dams, construction of access road and laying wearing course for slope protection.
Budget: 5,900,000 USD
Client: Lane Xang Minerals.
Description: Construction of 3 Star Hotel, Vientiane Municipal city.
Period: 2009
Scope: The works involve the construction of deep spread footing foundation, reinforced concrete columns and beams and floor, brickwalls, and tile roofing structures, paiting, floor tile works, etc.
Budget: 4,000,000 USD
Client: Khounxay Hotel.
Description: Contract for construction of access roads to Gold Plant in Ban Houay xai Gold-Silver Projects, 12.5Km.
Period: October 2009-May 2010
Scope: The works involves earth excavation, construction of embankment, installation of pipe and box culverts, stone box gabions for culvert protection works and placing crushed rock subbase.
Budget: 3,350,000 USD
Client: PHU BIA MINING LIMITED.
Description: Contract for construction of GS 2 Thenkham Sediment control dam.
Period: 1 February - 30 April 2011
Scope: The works involve clearing, grubbing and stripping topsoil, construction of earth embankment and stone erosion protection lay on the dam crests and downstream slope. Installation of pipe and pipe decant tower.
Budget: 1,295,000 USD
Client: Lane Xang Mineral Limited.
Description: Contract for upgrade of access road to Phu Kham Mine Site for Phu Bia Limited.
Period: January - May 2011
Scope: The work involve common excavation to reduce the road gradients, laying new basecourse, application of double surface treatment and installation of pipe culverts.
Budget: 1,280,000 USD
Client: Phu Bia Mining Limited.
Description: Contract for Widening Road 28A from Nabo - Nalou gate, 40 Km.
Period: November 2011- June 2012
Scope: The works involve excavation for widening of roadway, construction of embankment, laying crushed rock basecourse and application of double surface treatment.
Budget: 630,000 USD
Client: Lane Xang Mineral Limited
Description: Contract for construction of 4 prestressed concrete reinforced bridges along Road 28A.
Period: November 2011- June 2012
Scope: The works involve pile driving, construction of reinforced concrete abutments, manufacturing and installation of prestressed reinforcement girders ( 25m span), construction of top deck, installation of hand railings and construction of approach embankment. The work also include the stone box gabion and mattresses for erosion protection on abutments.
Budget: 1,615,000 USD
Client: Lane Xang Mineral Limited