Road Buildiing
|
- Construct and Maintain
- Gravel surfaces
- Sealed Roads
- Reinforced concrete roads
- Asphalt Roads
|
Equipment Rental
|
Download our List of Plant & Equiment
|
Bridge Building
|
- Build and Maintain
- Pilings
- Sub-structure
- Super-structure
- Bailey Bridge
- Pre-stressed concrete
- Span 18 - 25 metres
|
Piling
|
- Cast Piling
- Driven Concrete Piling
- Driven Timber Piling
- Sheet Piling
- Helical Piling
- Vibratory Piling Installation
|
Dams
|
- Tailing
- Sedimentary
- Under drainage systems
- Cut off trench
- Dam embankment
- Seepage drainage systems
- Slope protection
- Seepage sum
- 50,000,000 metres 3
- Pollution control
- Sedimentation trap
|
Site Clearance
|
- Removal of walls, hedges, ditches, and trees, other vegetation
- Dig, haul and disposal
- Technical advice
- Sample analysis
- Rubble crushing
- Materials seperation
- Earthworks
- Drainage
- Grubbing, stripping, top-soiling, sub-soiling and infilling
- Soil-conditioning
|
Stone Crushing
|
- 500 Tonnes/Hour
- Drill
- Blast
- Delivery
- Concrete
- Asphalt
- Road Base
- Testing/Analysis
|
Slope Protection
|
- Road
- Mountain
- River Bank
- Hard-armored concrete
- Granular backfill
- Welded wire mesh
|
Airport Construction
|
- Runway, taxi and apron pavement
- Hangar and tower construction.
- Fueling and deicing systems
- Access Constrol
- Runway Extension
|
Gypsum Mining
|
- 500,000 ton/year.
- Flexible quota
- Proven reservea
- High Quality
|
Demolition
|
- Interior Tear-out
- Building Wrecking
- Architectural Salvage
- Plant Deconstruction & Dismantlement
- Planned Deconstruction & Recycling
- Shoring
- Materials Salvaging
- Hazardous Waste Removal
|
Hospitality & Hotel
|
- Close to the International Airport
- 99 rooms and suites
- 3 Room types
- Business centre,
- Courier
- Photocopying/facsimile
- binding/wrapping
|